What happens when a 14,000 ft. steel line starts leaking?
Pulling 2 3/8 in. Thermoflex® Pipe through multiple diameters of steel
A company in Rockport, TX had an existing oil/brine/gas flow line between an offshore platform in the Gulf of Mexico and an onshore facility. An existing 14,000 ft. steel line had multiple leaks requiring regular repair. Thermoflex® spoolable pipe was determined suitable to pull through the existing line to create a new corrosion resistant line.